Not logged inOpenClonk Forum
Up Topic Elevators, Lifts, and Ropeways

This board is threaded (i.e. has a tree structure). Please use the Reply button of the specific post you are referring to, not just any random button. If you want to reply to the topic in general, use the Post button near the top and bottom of the page.

Post Reply
In Response to TheBuilder
By the way, if u guys were to implement the ropeways like this, i suggest only a 30 degree angle possible when building up or down, and should not be able to do this:
    http://forum.openclonk.org/image_show.pl?aid=551 <by Enrique
As in it shouldnt be able to zig zag over/under itself.
No splitting in the ropeway either, only at elevator or lift junctions should it be able to pick a different path, though u can connect one ropeway to the top of any elevator/lift and it goes wherever, and another one to the bottom of those same elevators/lifts, BUT, the 2 different ropeways should not be able to connect, otherwise elevators and lifts might become obsolete.

Can never think of an entire fully detailed description in one post, oh well.

Powered by mwForum 2.29.7 © 1999-2015 Markus Wichitill